Skip to content
Oro-Medonte acreage

Severances, second units and variances in Oro-Medonte

Can you sever a lot or add a second dwelling in Oro-Medonte? Official Plan severance limits, ARU and garden suite rules, minor variances, process and 2026 fees.

By , REALTOR®, Sales Representative

Updated · 12 min read

The short answer

In Oro-Medonte, rural severances are tightly limited: on Rural land the Official Plan allows at most one new lot (generally up to about 1 hectare) from a parcel that existed on October 5, 2022, and on Agricultural land new residential lots are limited to surplus farm dwellings. Second units are allowed in principle (up to three units total on eligible lots), but the current zoning by-law only permits one small apartment inside a house, and a township-wide update was still at the draft stage in November 2026.

Consent application fee (2026)
$2,567
Minor variance fee (2026)
$1,027 minor / $2,567 major
Pre-consultation (2026)
$770, credited if you apply
Rural severance limit
One new lot per parcel existing Oct 5, 2022
Farm severance minimum
40 ha for both severed and retained farm parcels

Severing a lot or adding a second dwelling in Oro-Medonte is possible in some cases, but the township's Official Plan sets firm limits, and the zoning by-law has not yet caught up with the plan. On land designated Rural, you can create at most one new lot from a parcel that existed on October 5, 2022, generally up to about 1 hectare. On Agricultural land, new residential lots are essentially limited to surplus farm dwellings. For second units, the plan allows up to three units on eligible lots, but today's zoning permits only one small apartment inside the house, and a township-wide update was still a draft in November 2026. Here is how each piece works, what it costs and how to approach it.

Start with the designation

Every answer depends on how your land is designated on Schedule A of the Official Plan. The plan was adopted by Council on October 5, 2022, approved by Simcoe County on November 14, 2023, and is consolidated as of July 2026. The zoning by-law (97-95, dating to 1997) is being rewritten to implement it, and until that is done both documents apply. Ask the Planning Division (705-487-2171, planning@oro-medonte.ca) to confirm the designation and zone of your property before you spend money on drawings or surveys.

Can I sever a lot in Oro-Medonte?

Rural designation

A limited number of new residential lots can be created on Rural land if every one of these conditions is met:

  • No more than one lot is created from a lot that existed on the date the plan was adopted.
  • The new lot is kept small (the plan says approximately 1.0 hectare maximum) to conserve larger blocks for farming or the environment, unless environmental constraints or design call for a larger lot.
  • The lot meets the Minimum Distance Separation formulae and will not affect neighbouring farmers' ability to expand.
  • It is not strip development.
  • Residential infilling is allowed between two existing homes on the same side of the road that are 100 metres (328 feet) or less apart, if it is not strip development.
  • Both the severed and retained parcels can be provided with water and sanitary services to the township's satisfaction.

Rural land within one kilometre of the Barrie or Orillia city boundary is treated under the Agricultural policies instead.

Agricultural designation

The plan discourages lot creation on prime farmland. It is only permitted for:

  1. Agricultural uses, where the severed and retained lots are each at least 40.0 hectares.
  2. Agriculture-related uses, on the smallest lot needed for the use and its services.
  3. A residence that is surplus to a farming operation after a farm consolidation. The dwelling must have existed when the plan was adopted, be habitable and sit on a parcel that is actively farmed. The new lot is kept to the minimum size for the house and services, and the remaining farmland is rezoned to prohibit a new home.
  4. Infrastructure that cannot use an easement or right-of-way.

Rural Residential, Settlement Areas and Rural Settlements

Lot creation is not permitted in the Rural Residential designation, which covers existing estate and country subdivisions. In Horseshoe Valley's Low Density Residential areas, new lots by consent are possible where a plan of subdivision is not needed. In Rural Settlements such as Shanty Bay, Hawkestone or Warminster, development is generally limited to infilling and minor extensions of existing neighbourhoods.

Tests that apply to every new lot

Before granting provisional consent, the township must be satisfied that both the severed and retained lots:

  • Front on, and are accessed directly from, a public road maintained year-round.
  • Do not take direct access to a provincial highway or County road unless that authority supports it.
  • Have enough size and frontage under the zoning by-law, and can be serviced with water and sewage disposal.
  • Will not harm drainage, groundwater, or ecological features (studies may be required).

New lots must be created outside natural hazards, including wetlands, and lots cannot be created on private roads, unopened road allowances, unassumed roads or roads maintained only part of the year. The township may require cash-in-lieu of parkland (its preferred option), road widenings and a development agreement registered on title. A plan of subdivision, rather than a consent, is generally required if a new road is needed or more than five lots (including the retained land) would be created.

Consents can also be granted for easements, deed corrections, minor boundary adjustments and farm consolidations, as long as no new lot results. A boundary adjustment cannot create a building lot except where it gives a landlocked parcel frontage on a year-round maintained road. If two lots merged on title by accident, a "technical severance" can sometimes recreate the original lot, but not on Agricultural land, and only if it fronts a year-round public road and can be serviced.

Can I add a second dwelling or garage suite?

What the Official Plan allows

The Official Plan lists additional residential units (ARUs) as a permitted use in the Agricultural, Rural, Rural Residential and Horseshoe Valley Low Density Residential designations, among others, and Section 4.9 sets the rules. Where they are permitted:

  • Up to two ARUs are allowed within a single detached, semi-detached or row house, and up to one in an accessory building, for a maximum of three units including the main dwelling.
  • On Agricultural or Rural land, ARUs must be within the existing cluster of buildings and must meet Minimum Distance Separation.
  • The lot needs adequate potable water and sewage disposal acceptable to the township, and frontage with an entrance onto a publicly maintained road.
  • ARUs are not permitted in hazardous lands regulated by the conservation authority, including basements or accessory buildings on those lands.
  • An ARU cannot be severed later, and surplus farm dwelling policies cannot be used to create a lot for one.
  • The township may require the unit to be registered.

What today's zoning allows

Zoning By-law 97-95 has not caught up. Section 5.4 allows one apartment dwelling unit inside a single detached house in the Residential One (R1), Rural Residential One and Two (RUR1, RUR2) and Agricultural/Rural (A/RU) zones, if:

RequirementStandard
Main house sizeMore than 110 m² (1,184 sq. ft.) gross floor area, not counting the apartment
Apartment sizeAt least 50 m² (538 sq. ft.) and no more than 70 m² (753.5 sq. ft.)
EntranceIts own means of egress to the outside
WindowAn above-grade window opening of at least 0.30 m²
ParkingOne space per accessory apartment

The by-law does not provide for units in detached buildings, so owners have been applying for site-specific zoning amendments. One 2024 application, for example, sought to convert a temporary garden suite into an apartment in an oversized detached accessory building, with 87.6 m² of floor area where the standard is 70 m².

The proposed update (November 2026)

The township's zoning review put accessory residential units first on its priority list. A draft general amendment went to a public meeting on November 4, 2026. As drafted, it would:

  • Allow up to two apartments in the main house, or one apartment plus one detached accessory dwelling unit, in the RUR1, RUR2 and A/RU zones (and in an R1 exception zone).
  • Allow one apartment in a house in the R1, R2, Shoreline Residential, Residential Limited Service, Private Recreation and Institutional zones.
  • Set minimum lot sizes of 0.18 hectares for an apartment and 0.32 hectares for a detached unit on private services, and 0.05 hectares on communal services.
  • Require verification of septic capacity before a building permit on lots not on communal services.
  • Cap units at 50% of the main dwelling's floor area or 110 m², whichever is greater, and limit detached units to 4.0 metres high (single storey) or 5.0 metres above another accessory use.
  • Require the unit to share the main driveway, sit within 50 metres of the main house, and have one parking space.
  • Permit mobile and modular homes, but not park model trailers, as detached units.

Council does not decide at a public meeting, and the draft may change. Check the township's Zoning By-law Review page or ask Planning whether the amendment has been passed before you plan around it.

Does the provincial three-unit rule apply?

Probably not on rural land. The Bill 23 changes that took effect November 28, 2022 allow up to three units per lot where residential uses are permitted in settlement areas with full municipal water and sewage services, overriding local rules there. Most rural Oro-Medonte properties have a private well and septic, so the township's own rules above govern.

Garden suites

A garden suite (a "granny flat") is a portable, detached unit with a kitchen and bathroom, and the Official Plan treats it as temporary, not as an ARU. It needs a site-specific temporary use by-law and an agreement with the township covering installation, removal, maintenance and securities. It can be approved for up to 20 years, with extensions of up to three years at a time. It cannot be rented for profit, is generally discouraged on Shoreline lots, is not allowed in hazardous lands, and may not be permitted if the lot already has an ARU. Garden suites also require site plan approval.

When do I need a minor variance instead?

If what you want is close to the zoning rules but not within them (a bigger garage than the 100 m² cap in the A/RU zone, a reduced setback, a slightly larger apartment), a minor variance may be the route. The Development Services Committee, acting as the committee of adjustment, can only grant a variance it finds is minor, desirable for the appropriate use of the land, and in keeping with the general intent of both the zoning by-law and the Official Plan. It can attach conditions, such as a development agreement or keeping existing trees. A change of use or something well outside the rules usually needs a zoning by-law amendment instead.

How the application process works

  1. Talk to Planning first. A pre-consultation application ($770 in 2026) gets staff comments on your idea and the studies you will need. The fee is credited if you go on to file a full application.
  2. Gather the pieces. Typically a sketch or survey, and depending on the site, servicing confirmation, an MDS calculation, or an environmental impact study. Conservation authority review may be needed if regulated features are nearby.
  3. Apply through Cloudpermit. Consent, minor variance, zoning amendment and site plan applications are all submitted online.
  4. Public hearing. The Development Services Committee hears consent and variance applications in a hybrid meeting in Council Chambers at 148 Line 7 South. Neighbours are notified and can comment in writing or in person.
  5. Decision and appeal period. After the decision, there is a statutory appeal period under the Planning Act. Appeal rights to the Ontario Land Tribunal are limited to the applicant, specified persons and public bodies, and only if they made submissions before the decision.
  6. Fulfil conditions. For a consent, you complete the conditions (survey, any rezoning, parkland payment, development agreement) within the time the Planning Act allows, then the township issues the consent certificate so the new lot can be transferred.

Timelines vary with the season, the hearing calendar and whether studies are needed. Ask Planning for current hearing dates when you file.

If you are buying a lot that depends on a severance or variance that has not been finalized, do not assume it will go through on schedule. Ask your lawyer how to structure the offer, for example making it conditional on the consent certificate being issued, and build a generous buffer into your closing date so a delayed hearing or an appeal does not leave you scrambling.

What does it cost in 2026?

Township fees from Schedule E of the Fees and Charges By-law (2025-129). Fees include applicable taxes.

Application2026 fee
Pre-consultation (credited if you apply)$770
Provisional consent$2,567
Certificate of consent (retained lands) or cancellation$257
Amendment to conditions of provisional consent$1,027
Minor variance, minor$1,027
Minor variance, major$2,567
Zoning by-law amendment, minor$4,107
Zoning by-law amendment, major$7,458
Zoning by-law amendment as a condition of consent$615
Temporary use by-law (for example, a garden suite)$4,621
Development agreement$2,050
Zoning certificate$257

The township also requires refundable deposits of $2,500 for minor applications, $10,000 for major ones and $25,000 for combined applications. Budget separately for a surveyor, any planning consultant, studies, conservation authority review fees, parkland cash-in-lieu, and your lawyer.

How Jordan can help

Whether you are buying land with severance or second-unit potential, or selling a property where those rights affect value, the details above change the price. Jordan Rossman, a REALTOR® with Real Broker Ontario Ltd., Brokerage, can help you confirm a property's designation and zoning, connect you with planners and surveyors, and structure conditions so you are not paying for potential that may not be approved. Call 705-345-0797 to book a consultation.

Talk it through

Get a straight answer from someone who works here every day.

Ask Jordan anything about buying or selling in Orillia and lake country. No scripts, no pressure — just local knowledge.

Jordan Rossman

Jordan Rossman

REALTOR®, Sales Representative

Real Broker Ontario Ltd.

Your details go straight to Jordan — never sold or shared. See the privacy policy.

Questions people ask

Can I sever a building lot from my rural property in Oro-Medonte?

Possibly, if the land is designated Rural. The Official Plan allows no more than one new lot from a parcel that existed when the plan was adopted (October 5, 2022), generally up to about 1 hectare, if it meets Minimum Distance Separation, is not strip development and both parcels can be serviced. Both lots must front a public road maintained year-round.

Can I sever a lot from farmland in Oro-Medonte?

Only in narrow cases. In the Agricultural designation, new lots are limited to farm parcels where both the severed and retained parts are at least 40 hectares, agriculture-related uses, a surplus farm dwelling after a farm consolidation, or infrastructure.

Can I build a second dwelling or garden suite in Oro-Medonte?

The Official Plan allows up to three units on eligible lots (the main house plus up to two additional residential units, only one of them in an accessory building). Today's zoning allows one apartment of 50 to 70 square metres inside a house in certain zones; detached units have needed site-specific rezonings. A garden suite needs a temporary use by-law and an agreement with the township.

Does Ontario's three-units-as-of-right rule apply in rural Oro-Medonte?

Generally not. The provincial rule from Bill 23 applies to residential lots in settlement areas with full municipal water and sewage services. Most rural Oro-Medonte properties are on a private well and septic, so the township's own Official Plan and zoning rules govern.

Can I sever my additional residential unit into its own lot later?

No. Oro-Medonte's Official Plan prohibits severing an additional residential unit, whether it is in the main house or an accessory building, and says surplus farm dwelling policies cannot be used to create a separate lot for one.

Who decides consent and minor variance applications in Oro-Medonte?

The township's Development Services Committee, which holds hybrid public hearings in Council Chambers at 148 Line 7 South. Applications are submitted through Cloudpermit after an optional or required pre-consultation with Planning staff.

Sources · checked November 9, 2026

  1. 1.Township of Oro-Medonte Official Plan (Office Consolidation, July 2026) — Township of Oro-Medonte
  2. 2.Zoning By-law 97-95 (Office Consolidation, September 2026) — Township of Oro-Medonte
  3. 3.Notice of Public Meeting: Proposed Zoning By-law Amendment (Accessory Residential Units, general amendment), October 14, 2026 — Township of Oro-Medonte
  4. 4.Zoning By-law Review — Township of Oro-Medonte
  5. 5.Schedule E – Planning Application Fees (By-law 2025-129) — Township of Oro-Medonte
  6. 6.Consent Application Notice of Public Hearing, 2026-B-01 — Township of Oro-Medonte
  7. 7.Notice of Receipt of Complete Application, 2024-ZBA-17 (detached accessory apartment) — Township of Oro-Medonte
  8. 8.New Resident Welcome Guide — Township of Oro-Medonte
  9. 9.Changes to Ontario Regulation 299/19: Additional Residential Units (ERO 019-6197) — Environmental Registry of Ontario
  10. 10.Minimum Distance Separation (MDS) formulae (Publication 853) — Ontario Ministry of Agriculture, Food and Agribusiness

Rules, rates and programs change. This guide is general information, not legal, tax or financial advice — confirm specifics with the municipality, your lawyer or your accountant. Spot something out of date? Tell Jordan.